How Much Land Will Detention Take From Your Site in Florida?
- JRH Engineering & Environmental Services, Inc.
- 4 minutes ago
- 4 min read

For developers planning projects in Florida, few variables impact profitability more than understanding how much land detention will consume. A detention pond can easily take 5-30% or more of your site—or potentially none at all with strategic design.
At JRH Engineering & Environmental Services (JRH), the premier provider of civil engineering and structural engineering design solutions in Texas, North Carolina, and Florida, we help clients maximize usable project area by designing detention systems that are compliant, cost-effective, and space-efficient.
Through strategic planning from the earliest design phases, projects achieve Done Quickly. Done Right. And for the Best Value while capturing significantly more land for revenue-generating uses.
Understanding Florida's Detention Requirements
Water Management District Standards and Regulations
Florida's detention requirements vary by region based on climate zones and local water management district standards. The South Florida Water Management District (SFWMD), Southwest Florida Water Management District (SWFWMD), and other authorities each establish specific detention sizing criteria. Florida requires both quantity control (detention for flood management) and quality treatment (retention addressing pollution control).
The required stormwater treatment volume typically equals one inch of runoff from impervious areas. For a 10-acre commercial development with 8 acres of impervious surface, treatment volume equals approximately 21,780 cubic feet or 0.5 acre-feet. Wet detention systems must provide 14-21 day residence time in permanent pool, with additional storage for storm events.
Key Distinctions: Detention vs. Retention
Detention basins temporarily store stormwater during rainfall, then drain to pre-storm levels, remaining essentially dry between storms. Retention ponds maintain permanent water levels sized to accommodate both quantity and quality requirements. This distinction matters substantially because retention systems typically occupy more land than detention systems.
Calculating Detention Land Consumption
Percentage of Site Area
Detention typically consumes 3-15% of residential site area, but 8-27% for high-intensity commercial projects on poorly drained soils. Variables affecting land consumption include soil drainage characteristics, rainfall intensity, impervious surface percentage, and design depth. A pond designed to 6-foot depth consumes dramatically less land than a 3-foot pond holding identical volume.
For example, one acre-foot of detention requires approximately 11 acres at 2-foot depth, but only 2.3 acres at 8-foot depth—a land savings of nearly 9 acres.
Strategies to Minimize Detention Land Consumption
Underground and Subsurface Systems
Underground detention represents the most effective strategy for minimizing surface land consumption. Underground systems use storage tanks, vaults, and modular systems occupying below-grade space, leaving valuable surface land available for buildings and parking.
One commercial development documented cost benefits by comparing conventional surface detention requiring 54,000 cubic feet and $260,000 installation against optimized underground detention requiring 44,000 cubic feet and $212,000—saving $48,000 while reducing storage volume. Another parking facility expanded parking area by 10% per lot by eliminating surface ponds through underground systems.
Low Impact Development (LID) and Green Infrastructure
Florida increasingly embraces LID and Green Stormwater Infrastructure approaches that distribute treatment across multiple decentralized facilities rather than massive centralized ponds.
Bioretention systems—small vegetated areas treating runoff through soil infiltration—eliminate detention requirements by filtering stormwater through planted soils. Multiple bioretention areas distributed throughout development collectively provide detention equivalent to single large ponds while occupying minimal land and enhancing site aesthetics.
One Central Florida residential project's LID design eliminated all on-site retention ponds through distributed bioretention and vegetated swales, increasing developable space by approximately 10% per lot. Another development reduced stormwater infrastructure costs by $1,020,000 by adopting LID approaches. Permeable pavement systems where parking lots themselves serve as detention storage eliminate dedicated ponds entirely.
Expert Design Engineering
Professional civil engineering can reduce detention land consumption 15-30% compared to standard approaches. Strategic pond placement creates layered development—detention beneath parking areas, designed as community parks with recreational trails, or integrated into landscape buffers. Depth optimization significantly impacts land consumption; deeper ponds reduce surface footprint dramatically.
The JRH Engineering Advantage
JRH Engineering brings comprehensive expertise minimizing detention land consumption. During feasibility analysis, we calculate requirements specific to site conditions, rainfall patterns, soil characteristics, and regulatory standards across all three states.
During design, we evaluate multiple strategies—surface ponds, underground systems, bioretention networks, permeable pavements—identifying the optimal approach for each project.
Our specialized focus on Texas, North Carolina, and Florida provides unmatched expertise in Florida's complex stormwater landscape. We understand that SFWMD requirements differ significantly from SWFWMD standards, and detention requirements vary by climate zone.
Our team regularly coordinates with all Florida water management districts, accelerating permitting and identifying regulatory pathways that minimize detention requirements while maintaining full compliance.
Conclusion
For Florida developers, detention land consumption is a controllable variable impacting project profitability. While traditional approaches result in detention consuming 8-15% or more of development sites, strategically designed systems reduce consumption to 2-5%—or eliminate surface detention entirely through underground systems or LID approaches.
The difference between poorly designed and expertly optimized detention is measurable in acres of additional land for revenue-generating development, thousands in construction cost savings, and accelerated timelines.
JRH Engineering & Environmental Services, the premier provider of civil engineering and structural engineering design solutions in Texas, North Carolina, and Florida, delivers expert stormwater detention optimization for projects throughout Florida. Our integrated approach evaluates all available strategies, identifying optimal solutions for each project.
Our regulatory expertise with Florida's water management districts accelerates approvals and identifies compliance pathways minimizing detention land consumption.
Contact JRH Engineering today to discuss how strategic detention optimization can maximize your site's development potential.