Large-Scale Multifamily Redevelopment — 348 Units Federal Public Housing | Civil Engineering
JRH Engineering provided comprehensive civil engineering design for one of the largest and most complex multifamily redevelopment projects in our portfolio — a federal public housing community serving 348 residential units with a total construction value of $111,000,000.
Project Highlights
-
348 residential units served
-
$111,000,000 total construction value
-
WBE-certified project delivery
-
Full civil infrastructure design — roads, water, sewer, and stormwater
Roadway & Access Design
-
New public roadway systems designed from concept through permitted construction documents
-
Geometric layout, pavement design, and access coordination with municipal engineers
Project Coordination
-
Multi-stakeholder coordination with public housing authorities, municipal engineers, and multiple regulatory agencies
-
Managed all civil engineering submissions from concept through final permitted construction documents
Utility Infrastructure
-
Water distribution system expansion to serve all 348 units
-
Sanitary sewer infrastructure design and extension to full development capacity
Stormwater Management
-
Comprehensive stormwater management system designed for long-term resilience
-
Full regulatory compliance with federal, municipal, and environmental standards

42-Acre Commercial Business Park — Multi-Agency Civil Infrastructure Design Commercial Development | Civil Engineering
JRH Engineering provided full civil engineering design for a 42-acre commercial business park — a large-scale private development requiring technical coordination across TxDOT, the US Army Corps of Engineers, and a local Municipal Utility District simultaneously.
Project Highlights
-
42 acres of commercial development
-
TxDOT + USACE + MUD — triple-agency permitted
-
Regional stormwater detention system design
-
WBE-certified project delivery
Stormwater & Drainage
-
Regional stormwater detention system sized for post-development runoff mitigation
-
Comprehensive internal drainage network serving multiple commercial buildings
-
Floodplain mitigation design bringing developable area into full regulatory compliance
Utility Infrastructure
-
Water distribution system design serving all commercial buildings across the 42-acre site
-
Sanitary sewer infrastructure design and coordination through Municipal Utility District requirements
Roadway & Access
-
Internal access roadway design connecting the development to the adjacent public street network
-
TxDOT driveway and access point coordination and permitting

HTeaO Pearland — Stormwater Engineering & TxDOT Permitting Commercial Drive-Through | Civil Engineering
JRH Engineering provided complete civil engineering design for a drive-through commercial development along a state highway corridor — a technically demanding project requiring coordination with TxDOT, the City of Pearland, and an adjacent property owner to deliver a fully permitted, shovel-ready site.
Project Highlights
-
1.51 acres — drive-through commercial development
-
Dual detention pond system — engineered for both 10-year and 100-year storm events
-
TxDOT permitted
-
City of Pearland permitted
Site Civil Design
-
Drive-through circulation layout and 21-space parking facility design
-
ADA-compliant pedestrian access design
-
CMU retaining wall design at the shared property boundary
Utility Design
-
Potable water service with backflow prevention
-
Fire protection system design
-
Sanitary sewer with grease interceptor
-
Site drainage design
TxDOT Permitting
-
Driveway alignment coordination with TxDOT
-
Storm culvert crossing design at state ROW

Terra Estates — 62-Lot Residential Subdivision Full Civil Design & Construction Management
JRH Engineering delivered complete civil engineering design and construction management services for Terra Estates — a 62-lot residential subdivision with a construction value of $1,599,449, coordinated from initial infrastructure design through final municipal approval and active construction management.
Project Highlights
-
62 residential lots
-
$1,599,449 construction value
-
TxDOT permitted public roadway access
-
Full civil design plus active construction management
Sanitary Sewer
-
Public sanitary sewer extension connecting the development to the existing municipal system
-
Hydraulic analysis, pipe sizing, and agency coordination through final approval
Roadway Design
-
Internal subdivision roadway network
-
Pavement cross-sections, curb and gutter, and geometric design
-
TxDOT permitting for public roadway access — managed from application through approval
Stormwater
-
Comprehensive storm sewer system designed to manage subdivision runoff
-
Full compliance with local drainage and stormwater requirements
Construction Management Services JRH Engineering provided active, on-call construction support throughout the build:
-
Contractor submittal review
-
RFI responses
-
Site observation visits
-
Field conformance verification against permitted documents
.webp)
Magnolia Trails Section 1 — 113-Lot Master-Planned Residential Subdivision Full Civil Design & MUD Coordination
JRH Engineering provided comprehensive civil engineering design for Magnolia Trails Section 1 — a 113-lot master-planned residential subdivision spanning 51.4 acres in Brazoria County, Texas, delivered in partnership with Sullivan Brothers Builders.
This large-scale land development project required coordinated engineering across multiple public agencies and utility districts from initial site planning through final plat approval.
Project Highlights
-
113 residential lots
-
51.4 acres — Brazoria County, TX
-
BCMUD 81 + City of Alvin — dual-agency coordinated
-
Delivered in partnership with Sullivan Brothers Builders
-
Full civil design from raw acreage through permitted, construction-ready documents
Mass Grading
-
Full 51.4-acre mass grading design
-
Finished lot grades, drainage patterns, and earthwork quantities established across the entire tract
-
Site prepared for immediate residential construction upon permit approval
Utility Infrastructure
-
Offsite water distribution system designed and extended to serve all 113 lots
-
Sanitary sewer infrastructure designed and coordinated through two agencies simultaneously
Stormwater Management
-
Storm sewer collection system design
-
Detention facility design for water quantity control
-
Drainage outfall design
-
Full compliance with local floodplain and MUD standards
-
Complete SWPPP prepared and submitted with construction permitting package
Paving & Pedestrian Infrastructure
-
Internal subdivision roadway network — geometric layout and pavement cross-sections
-
Curb, gutter, and ADA-compliant pedestrian infrastructure throughout the development