Lutheran South Academy Sports Complex — 23-Acre Athletic Facility Engineering in Houston, TX

Houston · Harris County · Texas

Institutional, Educational & Athletic Facilities

Lutheran South Academy 23-acre sports complex in the Houston floodplain

A sports complex expansion inside the Harris County floodplain

JRH Engineering provided complete civil engineering design for a 23-acre sports complex expansion at Lutheran South Academy in Houston, Texas, located within the Harris County floodplain inside the City of Houston. The project required a City of Houston permit on a constrained budget without sacrificing sports field area. JRH used open ditch drainage instead of underground storm sewer, minimized building pad fill, and located detention near the outfall — keeping both construction cost and permitting complexity as low as possible.

AT A GLANCE

Site civil design

  • Full civil design for a 23-acre sports complex expansion including field layout, grading, and access

  • Open ditch drainage selected over underground storm sewer — significantly lower construction cost and fewer agency approvals required

  • Building pad fill minimized — less fill means less impervious impact means less detention volume required

  • Sports field layout maximized usable athletic area within the floodplain site constraints

Stormwater and drainage

  • Open ditch drainage eliminated underground storm sewer from the construction scope — cost savings passed directly to the project budget

  • Detention located near the outfall — minimizing pond size by reducing travel distance and taking advantage of natural topography

  • Building pad fill kept to a minimum — cascading cost and permitting savings from a reduced fill requirement

Permitting and agency coordination

  • City of Houston permit pursued with a streamlined submission — open ditch drainage reduced the complexity of the storm sewer design package

  • Floodplain compliance achieved through the fill minimization strategy — less fill, less detention, simpler floodplain documentation

The Challenge — flat fields, floodplain fill, and a fixed budget

Sports complexes in the Houston floodplain have a specific tension: the fields need to be flat and usable, but raising them above the base flood elevation requires fill, which requires detention, which costs money and consumes land. On a constrained budget, every unnecessary dollar spent on drainage infrastructure is a dollar that cannot go toward athletic facilities.

JRH’s Approach — three decisions, each saving money independently

Open ditch drainage replaced underground storm sewer — the same drainage function at a fraction of the construction cost, and a simpler city review package. Building pad fill was minimized to reduce the detention volume requirement and cut earthwork cost. Detention was placed near the outfall to take advantage of natural grade and minimize pond size.

The Results

01

Underground storm sewer eliminated — open ditch drainage reduced construction cost and simplified city review

02

Building pad fill minimized — cascading savings in detention volume, earthwork cost, and floodplain documentation

03

Detention located near the outfall — natural grade used to minimize pond size and construction footprint

04

SERVICE

Have a site like this?

Tell us the constraint. We will tell you what it takes to permit it.

FREE CONSULTATION

Let's talk about your upcoming project.

Frequently Asked Questions

What was the main engineering challenge on the Lutheran South Academy sports complex?

Raising sports fields above the Base Flood Elevation on a constrained budget required minimizing every cost driver in the drainage design without sacrificing usable field area.

How did JRH Engineering deliver the sports complex within budget?

JRH used open ditch drainage instead of underground storm sewer, minimized building pad fill to reduce detention volume, and placed detention near the outfall to take advantage of natural grade.

What were the results of the Lutheran South Academy project?

JRH reduced construction cost through open ditch drainage, achieved cascading savings in detention volume and earthwork by minimizing fill, and delivered a fully permitted 23-acre sports complex within the client's budget.