Windstorm requirements in North Carolina

In North Carolina, required design wind speeds in this guide range from 115 to 150 mph depending on location. Outer Banks / Coastal is listed at 130-150 mph with common roof uplift of 50-80 psf; the typical insurance credit trigger is Fortified Home or IBHS rating.

County or Area
Wind Speed Required mph
Exposure Category
Risk Category I mph
Risk Category II mph
Common Roof Uplift psf
Typical Insurance Credit Trigger
Outer Banks / Coastal
130-150
D (open)
130-150
140-170
50-80
Fortified Home or IBHS rating
Wilmington / Southeast
120-140
C
120-140
130-150
40-65
Sealed wind design
Charlotte Metro
115-130
B
115-130
120-140
30-50
Impact windows + straps
Raleigh / Triangle
115-125
B
115-125
120-135
25-45
Engineered roof-to-wall connections

Updated 2027 • ASCE 7-22 based • Coastal highest • Confirm local amendments

Notes & assumptions

01

Coastal counties have highest requirements. JRH provides sealed designs and Fortified documentation support.

GUIDE 09 - 2027 EDITION

Windstorm Cheat Sheet in TX, NC, and FL

Texas, Florida & North Carolina (2027)

Wind design requirements vary by region and risk category. Typical design wind speeds, exposure, roof uplift, and what triggers an insurance credit, region by region. 

TX

115-150

mph

FL

130-180

mph

NC

115-150

mph

Required design wind speed across the region in this guide.

Important Note: The information in these guides is for general reference only. A licensed Professional Engineer should review any actual design or construction work. JRH Engineering assumes no responsibility for the application or use of these materials.

BY STATE 

Wind requirements in all three states

TX - 2027

Windstorm requirements in Texas

In Texas, required design wind speeds in this guide range from 115 to 150 mph depending on location. Texas Coast (TDI Zone) is listed at 130-150 mph with common roof uplift of 40-70 psf; the typical insurance credit trigger is WPI-8 Certification.

County or Area
Wind Speed Required mph
Exposure Category
Risk Category I mph
Risk Category II mph
Risk Category III/IV mph
Common Roof Uplift psf
Typical Insurance Credit Trigger
Texas Coast (TDI Zone)
130-150
C (open)
120-140
130-150
140-170
40-70
WPI-8 Certification
Inland 100 miles
120-140
B or C
110-130
120-140
130-150
30-50
Sealed engineering letter
Houston Metro
130-140
C
120-130
130-140
140-160
45-65
WPI-8 or engineered design
Dallas-Fort Worth
115-130
B
110-120
115-130
130-140
25-40
Impact-rated windows + bracing
Austin / Central TX
120-135
B or C
110-125
120-135
130-145
35-55
Fortified Roof or sealed plans

01

Values approximate. Always obtain site-specific wind speed. JRH provides sealed wind designs and WPI-8 support where applicable.

Updated 2027 • ASCE 7-22 based • Confirm site-specific with AHJ or approved tool • WPI-8 still key for coastal

Notes & assumptions

FL - 2027

Windstorm requirements in Florida

A typical Florida subdivision takes 37-76 weeks from feasibility to construction permits across 7 phases; the fastest realistic timeline is 10-14 months. Phase 1, Feasibility & Due Diligence (survey + environmental + concurrency + title), typically takes 5-12 weeks; a common hold-up is: concurrency reservation expires.

County or Area
Wind Speed Required mph
Exposure Category
Risk Category I mph
Risk Category II mph
Risk Category III/IV mph
Common Roof Uplift psf
Typical Insurance Credit Trigger
Miami-Dade / Broward (HVHZ)
175-180
Yes (C/D)
165-180
175-190
185-200
70-100
NOA + Miami-Dade Product Approval
Palm Beach County
150-170
Partial
150-170
160-180
170-195
60-90
Florida Product Approval + sealed plans
Tampa Bay Area
140-160
No
140-160
150-170
160-185
50-80
Fortified Roof or opening protection
Orlando / Central FL
130-150
No
130-150
140-160
150-170
45-70
Impact-rated openings
Panhandle
140-160
No
140-160
150-170
160-185
55-85
Fortified Home designation

01

9th Edition keeps ASCE 7-22 framework. Confirm exact site wind speed and whether HVHZ or WBDR applies. JRH delivers full sealed wind packages.

Updated 2027 • FBC 9th Edition / ASCE 7-22 • Wind speeds largely consistent with prior maps • Product Approvals mandatory

Notes & assumptions

Related reference guides

All 2027 reference guides

04 - Permitting

Top 10 Permit Red Flags

Why permits get rejected, and the quick fix.

05 - Structural

Pool & Outdoor Living Structural Guide

Shell, rebar, bonding and engineering costs.

03 - Foundations

Metal Building Foundation Selector

Foundation type by size, soil and wind speed.

FREE CONSULTATION

Let's talk about your upcoming project.

Frequently Asked Questions

How long does it take to develop a subdivision in Texas?

A typical Texas subdivision takes 31-56 weeks from feasibility to construction permits across 7 phases; the fastest realistic timeline is 8-12 months. Phase 1, Feasibility & Due Diligence (survey + zoning + soil + title), typically takes 4-8 weeks; a common hold-up is: expansive soils report missing.

How long does it take to develop a subdivision in Florida?

A typical Florida subdivision takes 37-76 weeks from feasibility to construction permits across 7 phases; the fastest realistic timeline is 10-14 months. Phase 1, Feasibility & Due Diligence (survey + environmental + concurrency + title), typically takes 5-12 weeks; a common hold-up is: concurrency reservation expires.

How long does it take to develop a subdivision in North Carolina?

A typical North Carolina subdivision takes 31-64 weeks from feasibility to construction permits across 7 phases; the fastest realistic timeline is 9-12 months. Phase 1, Feasibility & Due Diligence (survey + zoning + watershed + septic/health), typically takes 4-10 weeks; a common hold-up is: septic permit delay.

How current is this guide?

​This guide was updated in October 2026 for 2027. Construction costs are uplifted roughly 4% from the 2026 baseline, and references reflect ASCE 7-22 and, for Florida, the Florida Building Code 9th Edition (effective December 31, 2026).

Can I use this guide for my specific project?

No. These figures are general reference ranges, not engineering advice. Always verify current local codes, fee schedules, design criteria and site conditions with the Authority Having Jurisdiction, and contact JRH Engineering for project-specific sealed designs, estimates and permit packages.

Disclaimer: These guides are for general reference only and are not engineering advice for any specific project. Verify current local codes, fee schedules and site conditions with the Authority Having Jurisdiction.

​