Small-Bay Warehouse — Industrial Site Development Civil Engineering in Cocoa, FL
Cocoa · Brevard County · Florida
Industrial, Warehouse & Metal Building Development

Civil engineering and site development for a dock-access warehouse on the Space Coast
JRH Engineering provided complete civil engineering design for a new 25,000–30,000 square foot small-bay warehouse facility at 2156 South King Street in Cocoa, Florida — a full civil site development package for a tractor-trailer dock-access warehouse in one of Florida’s fastest-growing industrial and logistics markets. Existing structures on the property were demolished prior to construction and the new facility was oriented toward King Street. JRH designed the site layout, stormwater management, and utility infrastructure to meet Brevard County permitting requirements and Florida Building Code 8th Edition standards.
AT A GLANCE
Project facts
Project type — small-bay warehouse, industrial
Location — Cocoa, Brevard County, Florida
Scale — 25,000–30,000 SF warehouse with tractor-trailer dock access
Services — civil engineering, site development, stormwater design, utility design
Permitting agency — Brevard County
Client — confidential private developer
Completion — Q1 2026
Site civil design
Full site development plan package — site plan preparation, grading and drainage design, stormwater management, SWPPP, and paving design
Site layout built around the tractor-trailer dock configuration and a building orientation to King Street, balancing operational function against Brevard County permitting requirements
Truck turning radii, staging areas, and dock separation from the street frontage all carried into the grading and drainage design
Existing structures demolished and the site cleared before new construction — site design coordinated with the demolition scope
Utility infrastructure
Plan and profile design for sanitary sewer and water main connections, carried as a contingency item against Brevard County utility requirements
Client-provided boundary survey incorporated as the base document for the site design
Stormwater and drainage
Detention analysis sized for the increased runoff from the warehouse footprint and surrounding pavement — a large roof and pavement area demands careful detention sizing under Brevard County criteria
SWPPP prepared in compliance with Florida stormwater requirements
Drainage design coordinated with the dock configuration so no stormwater feature conflicts with an operational area
Permitting and agency coordination
Brevard County permitting package prepared — grading, drainage, stormwater, and site layout documentation
Florida Building Code 8th Edition compliance confirmed throughout the civil design
Kickoff consultation with JRH’s principal engineer set the project parameters before design began
The Challenge — dock operations and detention competing for the same ground
Small-bay warehouses with tractor-trailer dock access make site layout demands that run straight into drainage design. Dock configuration, staging areas, and truck turning radii compete for the same site area as the stormwater features, and on a constrained site those elements only coexist if they are coordinated from the first layout decision. Florida adds a second layer: the large impervious area of a warehouse roof and pavement field generates runoff that has to be detained to Brevard County’s standards.
JRH’s Approach — the dock layout set first, the drainage designed around it
JRH carried the tractor-trailer dock configuration into the grading and drainage design from the beginning rather than treating it as an afterthought. Truck turning radii were established first, staging areas were defined, and the stormwater system was then designed around the operational layout instead of against it. Detention was sized for the full impervious area of the warehouse and pavement fields, meeting Brevard County criteria without a pond that would have eaten into the truck operating area.
The Results
01
Tractor-trailer dock configuration built into the grading and drainage design from the first layout decision — no conflict between truck operations and stormwater features
02
Stormwater detention sized for the full warehouse and pavement impervious area, meeting Brevard County criteria without compromising the operational area
03
Complete civil site development package delivered for Brevard County permitting submission under Florida Building Code 8th Edition
04
Frequently Asked Questions
What was the main engineering challenge on the Cocoa small-bay warehouse project?
Dock configuration, truck turning radii, and staging areas all competed for the same limited site area as stormwater management on a constrained parcel.
How did JRH Engineering balance dock access and drainage at this Florida site?
JRH incorporated the tractor-trailer dock configuration into grading and drainage decisions from the first layout, sizing detention for the full warehouse and pavement impervious area to meet Brevard County criteria.
What were the results of the Cocoa warehouse project?
JRH integrated the dock configuration with the drainage design, sized stormwater detention correctly for the full impervious area, and delivered a complete civil package for Brevard County permitting.