Oleander on Broadway — 350-Unit Mixed-Use Housing Civil Engineering in Galveston, TX

Galveston · Galveston County · Texas

Residential & Multifamily Development

Oleander on Broadway 350-unit mixed-use housing development in Galveston, Texas

Civil engineering for a federally funded island housing development

JRH Engineering delivered complete civil engineering design for the Oleander on Broadway — a 9.8-acre, 350-unit mixed-use housing development in Galveston, Texas, combining federal and private funding. The project had no storm sewer outfall available, requiring a drainage solution that worked within Galveston coastal soil conditions. JRH designed a bioswale detention system that leveraged the island naturally sandy, highly permeable soil to absorb stormwater on-site — eliminating the need to engineer a remote outfall connection entirely.

AT A GLANCE

Site civil design

  • Full civil design for 9.8-acre mixed-use development including building pad layout, public road design, grading, and drainage

  • Two public roads designed through the project — required by the City of Galveston as part of the development approval

  • Bioswale detention system designed to utilize Galveston sandy coastal soil — stormwater absorbed on-site rather than piped to a remote outfall

  • Site layout accommodated 350 units across a mix of residential and commercial uses

Utility infrastructure

  • Water and sanitary tied into the City of Galveston municipal system

  • Utility connections coordinated concurrently with public road design and the drainage system

Stormwater and drainage

  • No storm sewer outfall available — a bioswale system was designed as the drainage solution

  • Galveston naturally sandy, highly permeable soil used as the drainage asset — stormwater infiltrates through bioswale channels without requiring a piped outfall

  • Remote outfall connection eliminated entirely — significant cost and engineering complexity avoided

  • Bioswale design met City of Galveston drainage requirements within the site footprint

Permitting and agency coordination

  • City of Galveston permitting for a federally funded, 350-unit mixed-use development — complex multi-discipline coordination managed by JRH

  • Federal funding compliance requirements maintained throughout the permitting process

  • Two public roads designed and approved as part of the development agreement

The Challenge — a drainage problem with no obvious solution

A 9.8-acre development with 350 units in Galveston with no storm sewer outfall is a drainage engineering problem with no obvious solution. Piping stormwater to a remote outfall on a coastal island is expensive, logistically complex, and dependent on finding a viable outfall route — which did not exist here. The project was also federally funded, adding compliance requirements that do not exist on private projects.

JRH’s Approach — designing around what the island geology already offered

Sandy coastal soil is highly permeable — stormwater that would pond on a clay soil site absorbs quickly on Galveston Island. A bioswale detention system channeled stormwater into vegetated swales where it could infiltrate on-site, meeting drainage requirements without a single pipe going to an outfall that did not exist. The result was a drainage solution derived from the site natural conditions rather than imposed over them.

The Results

01

  • Remote outfall connection eliminated — a bioswale system leveraged Galveston sandy soil for on-site stormwater infiltration

  • $111,000,000 construction value delivered with WBE-certified project management

  • Two public roads designed and approved as part of the City of Galveston development agreement

02

03

04

SERVICE

Have a site like this?

Tell us the constraint. We will tell you what it takes to permit it.

FREE CONSULTATION

Let's talk about your upcoming project.

Frequently Asked Questions

What was the main engineering challenge on the Oleander on Broadway development?

The 9.8-acre, 350-unit federally and privately funded mixed-use development had no storm sewer outfall available, and piping stormwater to a remote outfall on a coastal island was not a practical option.

How did JRH Engineering solve the drainage challenge at Oleander on Broadway?

JRH designed a bioswale detention system that used Galveston's naturally sandy, highly permeable coastal soil to absorb stormwater on-site, eliminating the need for a remote piped outfall connection entirely.

What were the results of the Oleander on Broadway project?

JRH eliminated the need for a remote outfall connection, delivered $111,000,000 in construction value under WBE-certified project management, and designed two public roads as part of the City of Galveston development agreement.