FM 1485 Industrial Site — Industrial Development Civil Engineering in New Caney, TX

New Caney · Montgomery County · Texas

Industrial, Warehouse & Metal Building Development

FM 1485 industrial development site in New Caney, Montgomery County, Texas

Designing an industrial site to stay under the detention threshold

JRH Engineering provided complete civil engineering design for a new industrial development in Montgomery County, Texas, with a specific goal: avoid triggering detention requirements entirely. JRH designed the project to disturb less than 15,000 square feet of land — keeping it under the Montgomery County detention trigger threshold — and eliminated an entire permitting track with a single design decision.

AT A GLANCE

Site civil design

  • Full civil design engineered to disturb less than 15,000 square feet of land — staying under the Montgomery County detention requirement threshold 

  • No detention pond designed, no detention permit required, no drainage district review triggered 

  • TxDOT coordination for site access 

  • Site layout optimized within the 15,000 SF disturbance constraint

Permitting and agency coordination

  • Montgomery County permit secured without a detention requirement — under-threshold disturbance documented 

  • TxDOT access coordination completed concurrently with county permitting 

  • Simplified permit package — no detention design, no drainage district submittal, no detention review

The Challenge — a bright line with expensive consequences

The Montgomery County detention threshold is absolute. Cross it, and you owe detention design, drainage district review, and construction. Stay under it, and none of that applies. The question is whether the development program can be achieved within the threshold.

JRH’s Approach — treat the threshold as a design parameter

JRH designed the project with the 15,000 SF threshold as the governing constraint, optimizing the site layout to achieve the development goal within the disturbance limit. No pond. No drainage district. No detention review. A clean, fast county permit.

The Results

01

Detention requirement eliminated — the project was designed to disturb less than 15,000 SF, staying under the Montgomery County trigger threshold

02

Drainage district review eliminated — no detention means no drainage district submittal

03

Fast, clean county permit — a simplified package with no detention design or review cycle

04

SERVICE

Have a site like this?

Tell us the constraint. We will tell you what it takes to permit it.

FREE CONSULTATION

Let's talk about your upcoming project.

Frequently Asked Questions

What was the main engineering challenge on the FM 1485 industrial site project?

The goal was to avoid triggering Montgomery County's detention requirement entirely, which required designing the development to stay under the county's disturbance threshold.

How did JRH Engineering avoid the detention requirement at FM 1485?

JRH designed the project to disturb less than 15,000 square feet of land, staying under Montgomery County's detention trigger threshold and eliminating an entire permitting track with that single design decision.

What were the results of the FM 1485 industrial site project?

JRH eliminated the detention requirement, removed drainage district review from the permit package entirely, and delivered a fast, clean county permit with a simplified submission.

bottom of page