top of page
JRH Engineering & Environmental Services, Inc. Logo

Engineering & Environmental Services

JRH

JRH Engineering  & Environmental Services, Inc. Logo

JRH

Engineering & Environmental Services, Inc.

JRH Engineering & Environmental Services, Inc. Logo

JRH

Engineering & Environmental Services

Structural Engineering for EV Stations in TX, NC & FL: Key Insights

  • JRH Engineering & Environmental Services, Inc.
  • Aug 4
  • 7 min read
Structural Engineering for EV Stations in TX, NC & FL: Key Insights

The Structural Engineering Behind EV Charging Stations: What Commercial Projects in Texas, North Carolina, and Florida Must Know


As the premier provider of civil engineering, structural engineering, and environmental engineering services in North Carolina, Florida, and Texas, JRH Engineering & Environmental Services recognizes that the rapid expansion of electric vehicle infrastructure across these three states presents unique structural engineering challenges that require specialized expertise and regional knowledge.


With electric vehicle adoption accelerating—Texas registering over 230,000 EVs, Florida becoming the second-largest EV market, and North Carolina's ambitious goal of 1.25 million zero-emission vehicles by 2030—the demand for properly engineered EV charging infrastructure has never been greater.


Understanding the Structural Engineering Fundamentals


Foundation Design Requirements


The structural integrity of commercial EV charging stations begins with properly engineered foundations that must accommodate multiple load conditions and environmental factors.


Unlike simple Pool Permits that typically involve straightforward residential installations, commercial EV charging infrastructure requires comprehensive structural analysis addressing wind loads, seismic forces, electrical equipment weights, and vehicle impact protection.


Standard Foundation Specifications:


  • Concrete Strength: Minimum 3,000 PSI compressive strength at 28 days, with many specifications requiring 4,000 PSI for enhanced durability

  • Reinforcement: #5 rebar at 12 inches on center, both top and bottom, with continuous reinforcement meeting ACI 318 standards

  • Dimensions: Typical 24" x 24" x 24" deep footings for Level 2 chargers, with larger foundations required for DC Fast Chargers

  • Base Preparation: 12-inch deep crushed rock base over engineered native subgrade compacted to 90% relative compaction


Anchor Systems and Connection Details


Proper anchoring represents a critical structural component often overlooked in preliminary planning phases. The Lawrence Livermore National Laboratory standards specify minimum requirements that exceed typical construction practices:


Anchoring Requirements:


  • Anchor Type: Minimum (3) 1/2-inch stainless steel wedge all-thread anchor rods

  • Embedment: 6 inches minimum embedment depth with 3 inches minimum exposed bolt length

  • Torque Specifications: 30 foot-pounds torque applied with calibrated equipment

  • Post-Installation: When retrofitting, 1-inch diameter by 6-inch deep holes filled with Hilti HIT-RE 500 V3 epoxy meeting ICC ESR-3814 standards


Load Analysis and Structural Considerations


Commercial EV charging installations must account for multiple load scenarios that require professional structural engineering analysis:


Dead Loads


  • Equipment Weight: Level 2 chargers typically weigh 200-400 pounds, while DC Fast Chargers can exceed 2,000 pounds

  • Foundation Self-Weight: Concrete foundation systems contribute 150-300 pounds per cubic foot

  • Ancillary Equipment: Electrical panels, conduit systems, and protective bollards add additional permanent loads


Live Loads


  • Wind Loading: Critical factor varying significantly across the three states based on regional wind speed requirements

  • Seismic Considerations: Particularly important in certain regions of Texas and specific coastal areas

  • Vehicle Impact: Protection systems must be designed to prevent damage from errant vehicles


Regional Building Code Requirements


Texas: Decentralized Approach with Local Variations


Texas operates under a highly decentralized building code system where individual municipalities adopt and enforce their own standards, creating significant variation across jurisdictions. This complexity requires engineers to navigate multiple code environments within a single state.


Key Texas Requirements:


  • Wind Loads: Coastal areas require design for 130-150 mph winds with mandatory WPI-8 windstorm certification

  • Foundation Depth: Varies by region due to expansive clay soil conditions, particularly in Dallas-Fort Worth and Houston areas

  • Professional Engineering: All structural components must be designed and sealed by a Texas-licensed professional engineer

  • Local Amendments: Cities like Dallas, Austin, Houston, and San Antonio maintain distinct requirements that can significantly impact design


Texas Cities Leading EV Infrastructure:


  • Corinth: Requires commercial parking lots to have at least one dedicated EV charging space

  • Austin: Offers 50% rebates up to $1,200 for Level 2 charging station installations

  • Dallas: Implementing updated building codes with EV-ready requirements for new construction


North Carolina: Standardized State Approach


North Carolina adopts a more unified approach through the North Carolina State Building Code, providing consistency while incorporating specific provisions for coastal construction and environmental protection.


North Carolina Structural Requirements:


  • Coastal Considerations: Enhanced wind resistance requirements under CAMA (Coastal Area Management Act)

  • Foundation Specifications: Standard requirements with modifications for coastal high-hazard areas

  • Professional Engineering: Licensed North Carolina PE required for all commercial installations

  • Environmental Compliance: Integration with state environmental protection requirements


North Carolina EV Infrastructure Development:


  • State Goal: 1.25 million zero-emission vehicles by 2030 under Executive Order 246

  • NCDOT Leadership: Active coordination of federal NEVI funding for highway corridor development

  • Utility Coordination: Duke Energy's $25 million plan includes 160 Level 2 and 40 fast-charging stations


Florida: Comprehensive Hurricane-Resistant Standards


Florida maintains the nation's most stringent building standards through the Florida Building Code, with enhanced requirements in High-Velocity Hurricane Zones (HVHZ) and specific provisions for coastal construction.


Florida Structural Requirements:


  • Wind Resistance: Structures must withstand 140-180 mph winds depending on location

  • Hurricane Compliance: Enhanced connection details and impact-resistant materials required

  • HVHZ Standards: High-velocity hurricane zones require additional structural analysis and certified products

  • Flood Considerations: Elevated installation requirements in designated flood zones


Florida EV Market Leadership:


  • Market Position: Second-most registered EVs nationally with over 250,000 vehicles

  • Infrastructure Gap: Only 3,500 public charging stations serving the growing EV fleet

  • NEVI Funding: Nearly $200 million in federal funding allocated for infrastructure expansion


Advanced Foundation Solutions


Precast Concrete Systems


Modern EV charging infrastructure increasingly utilizes precast concrete foundation systems that offer superior quality control and installation efficiency:


EV Blocks Technology:


  • Material: High-strength concrete with 4,000+ PSI compressive strength

  • Installation: Single-day installation by one person without specialized equipment

  • Durability: 150 mph wind tested with frost heave and high water table resistance

  • Flexibility: Universal adaptor plate accommodating various charger manufacturers


Helical Pile Systems


For challenging soil conditions or retrofit applications, helical pile foundations provide excellent load-bearing capacity and installation efficiency:


Helical Pile Advantages:


  • Immediate Loading: Steel foundations can be loaded immediately after installation

  • Soil Adaptability: Effective in both expansive clay soils (Texas) and sandy conditions (Florida)

  • Installation Speed: Common construction equipment can install systems rapidly

  • Load Capacity: Single 8-10 inch diameter helix adequate for most Level 2 applications


Electrical Load Integration with Structural Design


Load Management and Infrastructure Sizing


The intersection of electrical and structural engineering becomes critical when designing foundations that must accommodate both the physical equipment and the electrical infrastructure required for operation:


Electrical Load Considerations:


  • Level 2 Chargers: 7.2 kVA minimum per space, requiring 208/240V, 40-amp circuits

  • DC Fast Chargers: Significantly higher power requirements affecting foundation sizing and cooling needs

  • Load Management Systems: Dynamic load management systems require additional control equipment affecting structural loads


Conduit and Utility Integration


Structural foundations must accommodate extensive electrical conduit systems while maintaining structural integrity:


Conduit Requirements:


  • Minimum Size: 1-1/4 inch underground conduit for each future EVCS location

  • Routing: Strategic placement to minimize structural impact while providing accessibility

  • Expansion: Future-proofing for technology upgrades and capacity increases


Environmental and Safety Considerations


Vehicle Impact Protection


Commercial EV charging installations require comprehensive protection from vehicle impact through properly engineered barrier systems:


Protection Systems:


  • Bollards: Steel pipe bollards filled with concrete, designed for 10,000-pound impact loads

  • Wheel Stops: Precast concrete wheel stops positioned to prevent overrun

  • Curbing: Raised concrete curbing providing visual guidance and physical protection

  • Setback Requirements: Minimum clearances from travel lanes and parking areas


ADA Compliance and Accessibility


Structural design must incorporate accessibility requirements that affect foundation layout and site configuration:


Accessibility Requirements:


  • Slope Requirements: Maximum 2% slope in any direction within charging areas

  • Clear Space: Minimum 8-foot by 20-foot access aisle adjacent to charging equipment

  • Reach Range: Equipment controls within 15-48 inches above finish grade

  • Surface Materials: Stable, firm, slip-resistant surfaces meeting ADAAG standards


Risk Categories and Wind Load Analysis


Determining Appropriate Risk Categories


The structural engineering community continues to debate appropriate risk categories for EV charging infrastructure, with implications for both wind load design and overall structural requirements:


Risk Category Considerations:


  • Risk Category I: Applicable for basic charging infrastructure with minimal occupancy

  • Risk Category II: May apply to high-traffic commercial installations or critical infrastructure locations

  • Regional Variations: Different interpretations across Texas, North Carolina, and Florida jurisdictions


Wind Load Design Parameters


Wind loading represents a critical design consideration varying significantly across the three states:


State-Specific Wind Requirements:

  • Texas: 90-110 mph inland, 130-150 mph coastal with WPI-8 certification requirements

  • North Carolina: 100-120 mph interior, 130-150 mph coastal with enhanced tie-down requirements

  • Florida: 140-150 mph standard zones, 170-180 mph HVHZ areas with continuous load path engineering


Future-Proofing and Technology Integration


Scalability Considerations


Modern EV charging infrastructure must accommodate future technology advances and capacity expansions:


Design Flexibility:


  • Universal Mounting: Foundation systems that accommodate multiple charger manufacturers and models

  • Electrical Expansion: Oversized conduit systems and electrical rooms for future capacity increases

  • Technology Upgrades: Structural systems designed for heavier next-generation charging equipment


Integration with Renewable Energy


Increasingly, commercial EV charging installations integrate with solar photovoltaic systems, requiring coordination between structural disciplines:


Solar Integration Challenges:

  • Roof Loading: Additional dead loads from solar panel systems affecting building structures

  • Ground-Mount Systems: Coordination between charging station foundations and solar array foundations

  • Electrical Infrastructure: Shared electrical systems requiring comprehensive load analysis


Final Thoughts


The structural engineering behind commercial EV charging stations represents a complex intersection of regional building codes, environmental considerations, and rapidly evolving technology requirements.


Success in Texas, North Carolina, and Florida demands deep understanding of state-specific regulations, from Texas's decentralized municipal approach to North Carolina's coastal environmental protections and Florida's hurricane-resistant design mandates.


As the premier provider of civil engineering, structural engineering, and environmental engineering services in North Carolina, Florida, and Texas, JRH Engineering & Environmental Services possesses the specialized expertise necessary to navigate these complex requirements successfully.


Our comprehensive understanding of regional codes, combined with experience in diverse projects from Pool Permits to large-scale commercial installations, ensures that EV charging infrastructure projects meet all structural requirements while providing the reliability and safety that commercial operators demand.


Whether you're developing a single charging station or planning a comprehensive charging network, the structural engineering foundation you choose today will determine the long-term success and adaptability of your investment.


Partner with experienced professionals who understand that proper structural engineering isn't just about meeting today's codes—it's about building infrastructure that will serve communities safely and efficiently for decades to come.


References:


  1. LinkedIn: Installation of All Charging Station Components

  2. DOE: IECC 2024 EV Charging Infrastructure Requirements

  3. PLP: EV Charging Station Foundation

  4. Burns Group: Structurally Sound EV Solutions

  5. EV Connect: Building Codes Influence on EV Charging

  6. EV Blocks: Foundation Specialists

  7. LLNL: Electric Vehicle Charging Station Standards

  8. DOE AFDC: Building Codes and Ordinances

  9. Cyber Switching: Building Codes Influence on EV Charging

  10. Oldcastle Infrastructure: Foundation Solutions

  11. Lincoln Electric: EV Charging Roadmap

  12. ICC: Electric Vehicles and Building Codes Strategy

  13. Hubbell: Required Information for EV Foundation Design

  14. MXP Charger: Standardized Construction Requirements

  15. Jensen Precast: EV Blocks Foundation System

  16. JRH Engineering: Building EV Charging Station TX Guide

  17. DOE AFDC: State Highway EV Charging Regulations NC

  18. The Invading Sea: Florida EV Charging Infrastructure

  19. Dallas Builders: EV Charging Requirements

  20. North Carolina General Assembly: H.B. 255

  21. https://www.linkedin.com/pulse/installation-all-charging-station-components-vidyutva-c6toc

  22. https://www.energycodes.gov/sites/default/files/2024-05/NECC2024_EV.pdf

  23. https://www.ev.plp.com/solutions/charger-foundation

  24. https://www.burns-group.com/the-electric-vehicle-transition-relies-on-structurally-sound-solutions/

  25. https://www.evconnect.com/blog/how-building-codes-influence-ev-charging

  26. https://evblocks.com/us/

  27. https://www.llnl.gov/sites/www/files/2024-06/pel-e-111136_ev_charging_station.pdf

  28. https://afdc.energy.gov/fuels/electricity-codes-and-ordinances

  29. https://www.ev.plp.com

  30. https://engstandards.lanl.gov/drawings_details/electrical_pdf/ST-G4090-2-R0.pdf

  31. https://cyberswitching.com/how-building-codes-influence-electric-vehicle-charging-station/

  32. https://oldcastleinfrastructure.com/study/ev-charging-station-foundation-solutions/

  33. https://ch-delivery.lincolnelectric.com/api/public/content/fda786f18ecb4f52a21fd9eb00bdd1fc?v=0882cd19

  34. https://www.iccsafe.org/wp-content/uploads/21-20604_COMM_EV_Strategy_RPT_v5.pdf

  35. https://blog.hubbell.com/en/chancefoundationsolutions/required-information-to-design-an-ev-foundation

  36. https://www.mxpcharger.com/standardized-construction-requirements-of-electric-vehicle-charging-stations.html

  37. https://business.gov.nl/regulation/charging-stations-commercial-buildings/

  38. https://www.jensenprecast.com/products/ev-blocks-electrical-vehicle-charging-foundation-system/

  39. https://nklnederland.nl/wp-content/uploads/2021/12/NKL-Engels-2018-def-charging-stations.pdf

  40. https://evchargingsummit.com/blog/code-requirements-to-install-ev-charging-stations/

  41. https://www.jrhengineering.net/post/building-an-ev-charging-station-with-jrh-engineering-tx-guide

  42. https://afdc.energy.gov/laws/10413

  43. https://www.theinvadingsea.com/2024/10/02/electric-vehicles-evs-florida-charging-stations-bipartisan-infrastructure-law-tesla-sb-1084/

  44. https://dallasbuilders.org/city-of-dallas-proposing-solar-and-ev-charging-station-ready-requirements-in-new-building-codes/

  45. https://www.ncleg.gov/Sessions/2023/Bills/House/PDF/H255v0.pdf

  46. https://www.fdot.gov/emergingtechnology/home/evprogram/about

  47. https://www.climatepolicydashboard.org/policies/transportation/ev-charging-requirements

  48. https://www.lowndes-law.com/newsroom/insights/new-florida-law-changes-electric-vehicle-charging-station-regulations

  49. https://lrs.sog.unc.edu/bill/regulate-ev-charging-stations-0

  50. https://qmerit.com/blog/florida-electric-vehicle-laws-ev-charging-infrastructure-and-more/

  51. https://qmerit.com/blog/texas-electric-vehicle-and-ev-charging-laws/

  52. https://www.ncdot.gov/initiatives-policies/environmental/climate-change/Documents/nc-ready-electric-vehicle-charging.pdf

  53. https://www.energy.gov/sites/default/files/2022-09/florida-planning-for-evs-doe-report.pdf

  54. https://www.dfwcleancities.org/evreadiness

  55. https://afdc.energy.gov/fuels/laws/ELEC?state=nc

  56. https://afdc.energy.gov/laws/all?state=FL

  57. https://www.tdlr.texas.gov/ev-charging/

  58. https://www.doa.nc.gov/2613a-electric-vehicle-charging-station-equipment-accessories-installation-and-infrastructure

  59. http://stock24polebase.com/wp-content/uploads/2023/08/EVB-Master-Format-Specification_Mar2023.pdf

  60. https://www.gridx.ai/knowledge/load-management-for-ev-charging

  61. https://www.electrical-installation.org/enwiki/EV_charging_-_electrical_installation_design

  62. https://blog.hubbell.com/en/chancefoundationsolutions/3-types-of-ev-chargers-and-the-foundations-they-require

  63. https://www.eng-tips.com/threads/ev-charging-risk-category-for-wind.509245/

  64. https://evse.com.au/blog/load-management-electric-car-charging/

  65. https://plp.com/renewables/electric-vehicle/ev-charging-station-foundation

  66. https://www.rvo.nl/files/file/2019/01/Electric%20Vehicle%20Charging%20-%20Definitions%20and%20Explanation%20-%20january%202019_0.pdf

  67. https://gdiengdesign.com/ev-charging-station-integration-electrical-load-planning-large-parking-structures/

  68. https://www.csemag.com/back-to-basics-electric-vehicle-charging-and-renewable-energy/

  69. https://www.sciencedirect.com/science/article/pii/S2590123025011880

  70. https://www.kopperfield.com/blog/ev-charger-load-calc

  71. https://ietresearch.onlinelibrary.wiley.com/doi/10.1049/2023/9593445

  72. https://www.csemag.com/your-questions-answered-energy-power-demands-for-ev-charging/

  73. https://energycenter.org/sites/default/files/docs/nav/programs/pev-planning/san-diego/fact-sheets/ResComm%20EVSE%20Permit%20Guidelines%20v3_Final_attach.pdf

 
 
 

Comments


JRH Services

Our civil engineering company offers a comprehensive range of services designed to meet the diverse needs of our clients in Texas, North Carolina, and Florida.

 

Our capabilities include civil engineering, structural engineering, land development, and environmental engineering, making us a one-stop solution for all your engineering needs.

  •  

    As leading civil engineering consultants,

    we provide full-service solutions for a wide range of projects.

     

    From land planning to large-scale infrastructure projects, our civil engineering services cover every aspect of your project.

    Our experience and attention to detail ensure that your civil engineering projects are executed with precision, resulting in successful, sustainable developments that stand the test of time.

  •  

    We deliver expert consultation on environmental compliance, sustainable design, and regulatory requirements, ensuring your project aligns with state and federal guidelines.

     

    Our focus on ecological engineering ensures that your project also contributes to a healthier built environment.

  •  

    Our licensed professional engineers specialize in structural engineering, offering consultation, structural components inspection, structural analysis, structural system design, and sustainable design. ​

     

    Our expertise ensures that every structural element is designed and implemented to the highest standards of safety and functionality.

  •  

    JRH Engineering provides land development services that are tailored to meet the needs of developers looking to transform raw land into thriving communities.

     

    We assist with every stage of the development process, from land acquisition and parceling to infrastructure design and regulatory compliance.

     

    ​ Our expertise in civil engineering enables us to deliver repeatable, scalable solutions that maximize the potential of your land, ensuring successful and sustainable developments.

We Look Forward to Hearing From You!

(800) 227-9635

Or
Fill Out Our Form
and
JRH Will Get Back To You Shortly.

Contact JRH For A Free Consultation

Expert Engineering Solutions

Image of JRH's 3 Office Locations in TX, NC, and Forida
bottom of page