JRH Engineering provided complete civil engineering design for batting cage facilities at Fort Bend Christian Academy in Sugar Land, Texas, with a hard deadline: the facility had to be designed, permitted, and built before the start of the baseball season. JRH prioritized speed at every stage — streamlined design, complete first submission, and proactive city coordination — delivering a permitted facility with enough construction lead time to be ready for opening day.
AT A GLANCE
Site Civil Design
● Complete batting cage facility civil design including layout, grading, drainage, and access
● Design streamlined to meet the season deadline — full construction package produced efficiently without sacrificing completeness
● Complete first submission to City of Sugar Land — no revision cycles caused by incomplete drawings
Permitting & Agency Coordination
● City of Sugar Land permit targeted to the construction start date required for season-opening completion
● Proactive city coordination maintained throughout the review process
● Design to permitted construction-ready completed within the season deadline
RESULTS
● Season deadline met — facility designed, permitted, and constructed before opening day
● Complete first submission — no City of Sugar Land revision cycles from incomplete engineering package
● Fast-turnaround design delivery was the difference between a usable facility and an empty dugout