top of page
JRH Recent Blog Posts


Dual-Purpose Detention Ponds: A Texas Case Study
See how existing ponds and tanks became compliant detention facilities on real Texas sites — the same dual-purpose thinking cities are adopting.
Aug 113 min read


The Ceiling Every Growing Engineering Firm Hits
JRH Engineering's principal hit a growth ceiling doing everything himself. Here's the lesson, and what a coordinated team actually delivers.
Jul 294 min read


Wind Load Design Requirements for Florida Warehouses
Florida warehouses face specific wind load and enclosure requirements under the FBC. See what JRH Engineering addresses in real projects.
Jul 284 min read


Stamped Engineering Plans for TX, NC & FL Permits
Some building permits require a stamped, sealed engineering plan. See what triggers that requirement across TX, FL, and NC projects.
Jul 224 min read


JetZero's North Carolina Campus Signals Housing Demand Ahead
JetZero's $4.7B, 600-acre Greensboro campus is North Carolina's largest project ever. See what it means for residential land development nearby.
Jul 104 min read


Storm Sewer in Tx: Pt 4-Importance of Outfall Elevation into a Channel
Explore the vital role of outfall elevation into a channel in Texas storm sewer systems. Part 4 of our series by JRH Engineering.
Sep 28, 20232 min read
bottom of page
