top of page
JRH Engineering & Environmental Services, Inc. Logo

Engineering & Environmental Services

JRH

JRH Engineering  & Environmental Services, Inc. Logo

JRH

Engineering & Environmental Services, Inc.

JRH Engineering & Environmental Services, Inc. Logo

JRH

Engineering & Environmental Services

How to Subdivide Land in Texas | JRH Engineering & Environmental

  • JRH Engineering & Environmental Services, Inc.
  • Aug 5, 2024
  • 3 min read

Learn the Steps in subdividing land in Texas


Introduction: Subdivide Land In Texas


Subdividing land in Texas is a complex process that requires careful planning, regulatory compliance, and professional expertise.


At JRH Engineering & Environmental Services, Inc., we offer comprehensive services to guide you through every step of land development, from feasibility studies to site engineering and permitting.


This blog post provides a detailed overview of the subdivision process in Texas for 2024.


Understanding Jurisdiction


City Limits vs. Extraterritorial Jurisdiction (ETJ) vs. Unincorporated Areas


The first step in subdividing land is to determine the jurisdiction in which your property is located. This will dictate the specific regulations and authorities involved:


  • City Limits: Governed by city regulations.


  • ETJ: Governed by both city and county regulations.


  • Unincorporated Areas: Governed by county regulations.


Preliminary Planning


Consulting Professionals


Engage with professionals such as land surveyors, lawyers, and engineers. With JRH as your consulting expert, we can assemble either in-house professionals or expert partners to guide you through the feasibility - design - permit process.


Site Analysis


Conduct a thorough site analysis to understand the land's topography, soil conditions, drainage, and existing infrastructure. This will inform the feasibility and design of your subdivision.


Preparing a Preliminary Plat


Surveying


The land surveyor will measure and map out the land, creating a preliminary plat that outlines the proposed subdivision. This plat must comply with local zoning laws, environmental regulations, and infrastructure requirements.


Compliance


Ensure that the preliminary plat adheres to all relevant regulations, including zoning laws, floodplain management, and environmental protections.


Submitting the Preliminary Plat


City or County Submission


Submit the preliminary plat to the appropriate local authority, whether it be the city planning department or the county commissioner.


Public Hearing


Attend any required public hearings where the preliminary plat will be reviewed. Be prepared to address any comments or required modifications from the reviewing authority.


Final Plat Preparation


Detailed Plans


Prepare detailed plans for infrastructure improvements, including roads, utilities, and drainage systems. These plans must be reviewed and approved by an engineer.


Engineering Review


If required, have an engineer review and approve the infrastructure plans to ensure they meet all regulatory standards.


Submitting the Final Plat


Required Documents


Gather all necessary documents, including the final plat, infrastructure plans, environmental studies, and any other required permits or approvals.


Application Submission


Submit the final plat and accompanying documents to the local authority for final approval.


Awaiting Approval


Commissioners Court Approval


The final plat will be reviewed by the Commissioners Court or city planning commission. They may approve, approve with conditions, or disapprove the plat. Address any conditions or comments and resubmit the final plat as needed.


Post Fiscal Surety


Post any required fiscal surety, such as bonds or letters of credit, to ensure the completion of infrastructure improvements.


Recording the Plat


County Clerk


Once approved, record the final plat with the county clerk's office. This makes the subdivision official and allows for the sale of individual lots.


Infrastructure Development


Construction


Begin construction of infrastructure improvements according to the approved plans.


Inspection


Have the infrastructure inspected by the local authority to ensure compliance with the approved plans.


Final Steps


Completion Certification


Obtain a completion certification from the local authority once all infrastructure improvements are completed.


Sale of Lots


Once the plat is recorded and the infrastructure is completed, you can begin selling the subdivided lots.


Regulatory Considerations


County Regulations (Chapter 232)


Counties may have specific requirements for subdivisions, including right-of-way widths, street widths, and other infrastructure standards. Subdivisions must also comply with environmental regulations, such as floodplain management and groundwater availability[1].


City Regulations (Chapter 212)


Cities regulate subdivisions within their limits and ETJ to promote health, safety, and general welfare. This includes public hearings for plat approvals and specific rules for infrastructure and environmental protection[3].


Final Thoughts


Subdividing land in Texas involves navigating a complex web of regulations and requires careful planning and coordination with local authorities.


At JRH Engineering & Environmental Services, Inc., we offer professional services for all aspects of land development, from the critical first step of preparing a feasibility study to site engineering and permitting.


Contact us today to ensure your land subdivision project is a success.


Citations:

 
 
 

JRH Services

Our civil engineering company offers a comprehensive range of services designed to meet the diverse needs of our clients in Texas, North Carolina, and Florida.

 

Our capabilities include civil engineering, structural engineering, land development, and environmental engineering, making us a one-stop solution for all your engineering needs.

  •  

    As leading civil engineering consultants,

    we provide full-service solutions for a wide range of projects.

     

    From land planning to large-scale infrastructure projects, our civil engineering services cover every aspect of your project.

    Our experience and attention to detail ensure that your civil engineering projects are executed with precision, resulting in successful, sustainable developments that stand the test of time.

  •  

    We deliver expert consultation on environmental compliance, sustainable design, and regulatory requirements, ensuring your project aligns with state and federal guidelines.

     

    Our focus on ecological engineering ensures that your project also contributes to a healthier built environment.

  •  

    Our licensed professional engineers specialize in structural engineering, offering consultation, structural components inspection, structural analysis, structural system design, and sustainable design. ​

     

    Our expertise ensures that every structural element is designed and implemented to the highest standards of safety and functionality.

  •  

    JRH Engineering provides land development services that are tailored to meet the needs of developers looking to transform raw land into thriving communities.

     

    We assist with every stage of the development process, from land acquisition and parceling to infrastructure design and regulatory compliance.

     

    ​ Our expertise in civil engineering enables us to deliver repeatable, scalable solutions that maximize the potential of your land, ensuring successful and sustainable developments.

We Look Forward to Hearing From You!

(800) 227-9635

Or
Fill Out Our Form
and
JRH Will Get Back To You Shortly.

Contact JRH For A Free Consultation

Expert Engineering Solutions

Image of JRH's 3 Office Locations in TX, NC, and Forida
bottom of page