top of page
JRH Recent Blog Posts


Not All Dirt Is Worth the Dig: Why Feasibility Matters
A 100+ acre Texas site was sold as utility-ready. Here's why capacity, distance, and pipeline conflicts changed the real cost of the deal.
Sep 154 min read


Barndominiums vs. Custom Houses in Texas: A Comprehensive Guide
Barndominium vs custom house in Texas: how framing, foundations, code classification and wind design differ, with a metal building foundation example.
Sep 83 min read


How to Subdivide Land in Texas | JRH Engineering & Environmental
Subdividing land involves surveying, utility planning, drainage, and county approval. See how JRH Engineering handles it in TX, NC, and FL.
Sep 86 min read


Stormwater Injection Wells Boost Developable FL Land & ROI
Stormwater injection wells can reduce surface land dedicated to drainage in South Florida, increasing developable acreage and project ROI.
Sep 33 min read


Understanding Water Intake Structures: A Guide by JRH Engineering
Water intake structures range from municipal treatment plants to private wells. See how JRH Engineering designs water supply for land development.
Aug 213 min read


Dual-Purpose Detention Ponds: A Texas Case Study
See how existing ponds and tanks became compliant detention facilities on real Texas sites — the same dual-purpose thinking cities are adopting.
Aug 113 min read


Why Honest Engineering Advice Protects Developers
Honest engineering advice can save developers from unnecessary costs and bad decisions. See how JRH Engineering applies that in real projects.
Aug 73 min read


The Ceiling Every Growing Engineering Firm Hits
JRH Engineering's principal hit a growth ceiling doing everything himself. Here's the lesson, and what a coordinated team actually delivers.
Jul 294 min read


Wind Load Design Requirements for Florida Warehouses
Florida warehouses face specific wind load and enclosure requirements under the FBC. See what JRH Engineering addresses in real projects.
Jul 284 min read


Stamped Engineering Plans for TX, NC & FL Permits
Some building permits require a stamped, sealed engineering plan. See what triggers that requirement across TX, FL, and NC projects.
Jul 223 min read
bottom of page
