top of page
JRH Recent Blog Posts


Not All Dirt Is Worth the Dig: Why Feasibility Matters
A 100+ acre Texas site was sold as utility-ready. Here's why capacity, distance, and pipeline conflicts changed the real cost of the deal.
Sep 154 min read


How to Subdivide Land in Texas | JRH Engineering & Environmental
Subdividing land involves surveying, utility planning, drainage, and county approval. See how JRH Engineering handles it in TX, NC, and FL.
Sep 86 min read


Stormwater Injection Wells Boost Developable FL Land & ROI
Stormwater injection wells can reduce surface land dedicated to drainage in South Florida, increasing developable acreage and project ROI.
Sep 33 min read


Understanding Water Intake Structures: A Guide by JRH Engineering
Water intake structures range from municipal treatment plants to private wells. See how JRH Engineering designs water supply for land development.
Aug 213 min read


Dual-Purpose Detention Ponds: A Texas Case Study
See how existing ponds and tanks became compliant detention facilities on real Texas sites — the same dual-purpose thinking cities are adopting.
Aug 113 min read


The Ceiling Every Growing Engineering Firm Hits
JRH Engineering's principal hit a growth ceiling doing everything himself. Here's the lesson, and what a coordinated team actually delivers.
Jul 294 min read


Stamped Engineering Plans for TX, NC & FL Permits
Some building permits require a stamped, sealed engineering plan. See what triggers that requirement across TX, FL, and NC projects.
Jul 223 min read


Texas Flooding July 2026: What Developers Must Know
Parts of Texas are still flooding as of July 2026. JRH is helping developers keep projects on schedule with drainage design and flood-resilient planning.
Jul 195 min read


Regional Detention Pond Credits Save Texas Land
JRH Engineering used regional detention pond credits to free 11+ acres for development in Katy, TX. See how site value and timelines improved.
Jul 93 min read


Florida Flood Infrastructure Funding: 2026 Grants | JRH
Florida has active flood infrastructure grants available now through July–Sept 2026. Learn how to access FDEP Resilient Florida funding with JRH Engineering.
Jun 293 min read
bottom of page
