Metal Building Foundation Design in Katy, TX

Katy · Texas

Structural Engineering

Metal building on a concrete slab foundation in Katy, Texas

Drilled piers and grade beams under a manufacturer's frame

JRH Engineering designed the foundation for a pre-engineered metal building in Katy, Texas, about 70 by 40 feet. The slab sits on reinforced grade beams, with drilled piers at the exterior, and the anchor bolts follow the manufacturer's layout. JRH delivered sealed plans for the client to submit to the City of Katy.

AT A GLANCE

Project facts

  • Project type: metal building foundation, structural engineering

  • Location: Katy, Texas

  • Building size: about 70 by 40 feet (about 2,800 SF)

  • Building use: [to be confirmed]

  • Plans issued: July 2025

  • Client: confidential

Foundation design

  • 6-inch, 3,500 psi concrete slab on grade

  • Grade beams reinforced with six continuous #5 bars and #3 stirrups

  • Drilled piers with belled bases at the exterior, with a ledge detail

  • Foundation set at least 1 foot below final grade

Anchor bolt coordination

  • Anchor bolt layout taken from the manufacturer's drawings

  • Bolt diameters to be verified with the metal building supplier before concrete is placed

The Challenge: a frame that delivers its load at the columns

A metal building frame concentrates its loads at the column lines and edges. The foundation has to take those loads into the soil and hold the anchor bolts where the manufacturer's frame expects them.

JRH's Approach: grade beams, piers, and a matched bolt layout

JRH combined a reinforced slab and grade beams with drilled, belled piers at the exterior. The anchor bolt layout follows the manufacturer's drawings, and the plans call for bolt diameters to be checked with the supplier before concrete placement.

The Results

01

Sealed foundation plans for a 70 by 40 foot metal building, issued July 2025

02

Piers, grade beams, and slab designed together under one set of plans

03

A foundation design the client's contractor can submit for permit

04

SERVICE

Have a site like this?

Tell us the constraint. We will tell you what it takes to permit it.

FREE CONSULTATION

Let's talk about your upcoming project.

Frequently Asked Questions

What did JRH Engineering design for the metal building in Katy, TX?

JRH Engineering designed the foundation for a pre-engineered metal building of about 70 by 40 feet: a reinforced slab, grade beams, and drilled piers at the exterior.

Why were drilled piers used?

Drilled piers carry concentrated loads down into the soil. The right mix of slab, grade beams, and piers depends on the building's loads and the soil report.

Who supplied the anchor bolt layout?

The metal building manufacturer. JRH Engineering's foundation design follows the manufacturer's drawings.